Pile Driving Rig – First pile
Piling the first concrete pile. The ground is very soft and the concrete pile is sinking fast.
This recording was made at a construction site where an eleven floors house is being built. The traffic in this area is heavy and because of that you can here traffic in the background.
A pile driver is a mechanical device used to drive piles (poles) into soil to provide foundation support for building…
Kiadó
- Sounds of Changes
Az tárgy típusa
- Pile Driving Rig – First pile
- Pile Driving Rig
- Construction site
- Junttan
- sound
Dátum
- October 01 2014
Kiadó
- Sounds of Changes
Az tárgy típusa
- Pile Driving Rig – First pile
- Pile Driving Rig
- Construction site
- Junttan
- sound
Dátum
- October 01 2014
Szolgáltató intézmény
Aggregátor
Az ebben a tárgyban szereplő adathordozó licence (hacsak másképp nincs meghatározva).
- http://creativecommons.org/licenses/by/4.0/
Jogok
- Creative Commons - Erkännande
Időbeli
- October 01 2014
Helyek
- Sweden
- Svédország
Azonosító
- 1374
- http://kulturarvsdata.se/wws/object/1374
Nyelv
- sv
- swe
Szolgáltató ország
- Sweden
Gyűjtemény neve
Először jelent meg az Europeana
- 2015-11-12T09:21:38.849Z
Utolsó frissítés a szolgáltató intézménytől
- 2020-01-06T18:58:03.272Z